Cart $0.00 0
HomeShopProjector ScreensMotorised94 MOTORISED 1610 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION
$3,044.55 EA

94 MOTORISED 1610 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

Short description

Elite Screens ARE94XW3-E30

Elite Screens Aerie Tension ARE94XW3-E30 94 1610 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater ProAV and Custom Installation.

Key Specifications

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160 wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Optional custom sizes and materials
  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled ready to install
  • Aluminium housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Installation kit included
  • Internal Radio Frequency/Infrared receivers with IR RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • Out of stock

    Details

    Category:

    Description

    94 MOTORISED 1610 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

    Additional information

    Manufacturer

    Elite Screens

    Reviews

    There are no reviews yet.

    Be the first to review “94 MOTORISED 1610 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION”

    Your email address will not be published. Required fields are marked *