Cart $487.00 1
HomeShopProjector ScreensMotorised120 MOTORISED 169 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION
$4,317.27 EA

120 MOTORISED 169 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

Short description

Elite Screens ARE120HW3-E20

Elite Screens Aerie Tension ARE120HW3-E20 120 169 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theatre ProAV and Custom Installation.

Key Specifications

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160 wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled ready to install
  • Aluminium housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Internal Radio Frequency/Infrared receivers with IR RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • Out of stock

    Details

    Category:

    Description

    120 MOTORISED 169 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION

    Additional information

    Manufacturer

    Elite Screens

    Reviews

    There are no reviews yet.

    Be the first to review “120 MOTORISED 169 PROJECTOR SCREEN WITH LONG LEADER TENSIO NED AERIE TENSION”

    Your email address will not be published. Required fields are marked *